e-Repository BATAN

Advanced Search

a -Cut method based importance measure for criticality analysis in fuzzy probability – Based fault tree analysis

Julwan Hendry Purba, JHP and D.T. Sony Tjahyani, DTST and Surip Widodo, SW and Hendro Tjahjono, HT (2017) a -Cut method based importance measure for criticality analysis in fuzzy probability – Based fault tree analysis. a -Cut method based importance measure for criticality analysis in fuzzy probability – Based fault tree analysis, 110. pp. 234-243.

Full text not available from this repository.

Abstract

ABSTRACK Fuzzy probability – based fault tree analysis (FPFTA) has been recently developed and proposed to deal with the limitations of conventional fault tree analysis. In FPFTA, reliabilities of basic events, intermediate events and top event are characterized by fuzzy probabilities. Furthermore, the quantification of the FPFTA is based on fuzzy multiplication rule and fuzzy complementation rule to propagate uncertainties from basic event to the top event. Since the objective of the fault tree analysis is to improve the reliability of the system being evaluated, it is necessary to find the weakest path in the system. For this purpose, criticality analysis can be implemented. Various importance measures, which are based on conventional probabilities, have been developed and proposed for criticality analysis in fault tree analysis. However, not one of those importance measures can be applied for criticality analysis in FPFTA, which is based on fuzzy probability. To be fully applied in nuclear power plant probabilistic safety assessment, FPFTA needs to have its corresponding importance measure. The objective of this study is to develop an a - cut method based importance measure to evaluate and rank the importance of basic events for criticality analysis in FPFTA. To demonstrate the applicability of the proposed measure, a case study is performed and its results are then benchmarked to the results generated by the four well known importance mea- sures in conventional fault tree analysis. The results confirm that the proposed a -cut method based importance measure is feasible to evaluate critical basic events in FPFTA.

Item Type: Article
Subjects: Keselamatan dan Keamanan Nuklir
Divisions: Pusat Teknologi dan Keselamatan Reaktor Nuklir
Depositing User: USER PTKRN BATAN
Date Deposited: 21 Aug 2018 07:46
Last Modified: 21 Aug 2018 07:46
URI: http://repo-nkm.batan.go.id/id/eprint/3752

Actions (login required)

View Item View Item