e-Repository BATAN

Advanced Search

PERANCANGAN ALAT PENGUKUR WAKTU JATUH BATANG KENDALl DI RSG-GAS BERBASIS LABVIEW V8.5 DAN DAQ6009

Heri Suherkiman, HS and Sukino, Sukino and Ranji Gusman, RG (2012) PERANCANGAN ALAT PENGUKUR WAKTU JATUH BATANG KENDALl DI RSG-GAS BERBASIS LABVIEW V8.5 DAN DAQ6009. PROSIDING SEMINAR NASIONAL TEKNOLOGI DAN APLIKASI REAKTOR NUKLIR. ISSN 978-979-17109-7-8

[img]
Preview
Text
Heri_165.pdf

Download (4MB) | Preview

Abstract

PERANCANGAN ALAT PENGUKUR WAKTU JATUH BATANG KENDALl DI RSG-GAS BERBASIS LABVIEW V8.5 DAN DAQ6009; Reaktor RSG-GAS mempunyai 8 batang kendali yang berfungsi untuk mengendalikan laju reaksi fisi. Batang kendali merupakan sistem keselamatan teknis terpenting dan alat proteksi terakhir untuk memadamkan reaktor apabila terjadi kejadian tidak normal. Pengujian waktu jatuh batang kendali adalah salah satu cara untuk memastikan bahwa batang kendali dapat berfungsi sesuai dengan syarat operasi reaktor. Alat uji yang ada saat ini mempunyai keterbatasan yaitu hanya dapat mengukur satu batang kendali pada setiap pengukuran. Kendala lainnya adalah kesulitan mendapatkan alat pengganti dengan fungsi sarna dipasaran untuk menggantikan alat yang ada jika mengalami kerusakan. Oleh karena itu maka dilakukanlah perancangan alat pengukur waktu jatuh batang kendali berbasis LabView V 8.5 dan akuisisi data DAQ6009. Perancangan tersebut telah menghasilkan desain, spesifikasi komponen dan hasil pemrograman yang diharapkan dapat diaplikasikan untuk pembuatan alat ukur waktu jatuh batang kendali baru yang mempunyai fungsi yang sarna dengan alat sebelumnya dengan fasilitas yang lebih baik Kata kunci : Waktu jatuh batang kendali, labview, akuisisi data ABSTRACT MEASURING TOOLS DESIGN OF CONTROL RODS DROP TIME AT THE RSG-GAS BASED ON LABVIEW V8.5AND DAQ6009. The RSG-GAS reactor has 8 control rods that serve to control the rate of fission. Control rods are the most important technical safety systems and the last protective equipment to shut down the reactor in the event of abnormal incident. Testing of the control rods drop time is one way to ensure that the control rods can function in accordance with the requirements reactor operations. Existing test tools have limitations that can only measure one control rod at each measurement. Another problem is the difficulty of getting a replacement device with the same functionality in the market to replace existing tools if damaged Therefore, then we do design of control rods drop time based on Labview v8.5 and DAQ6009. The design has resulted design, components specification and programming that are expected to be applied to the manufacture of new control rods drop time measuring devices that have the same functionality as the previous tool with better facilities. Keywords: Control rods drop time, Labview, data acquisition

Item Type: Article
Subjects: Reaktor Nuklir > Teknologi Reaktor > Instrumentasi dan Kendali Reaktor
Divisions: Pusat Reaktor Serba Guna
Depositing User: EDITOR PRSG BATAN
Date Deposited: 25 Oct 2018 03:55
Last Modified: 25 Oct 2018 03:55
URI: http://repo-nkm.batan.go.id/id/eprint/4052

Actions (login required)

View Item View Item