e-Repository BATAN

Advanced Search

KAJIAN TERMOHIDROLIKA TERAS PLTN PWR DAN BWR TERHADAP KEJADIAN SBO MENGACU PADA KECELAKAAN FUKUSHIMA

Muhammad Subekti, MS (2011) KAJIAN TERMOHIDROLIKA TERAS PLTN PWR DAN BWR TERHADAP KEJADIAN SBO MENGACU PADA KECELAKAAN FUKUSHIMA. KAJIAN TERMOHIDROLIKA TERAS PLTN PWR DAN BWR TERHADAP KEJADIAN SBO MENGACU PADA KECELAKAAN FUKUSHIMA. pp. 130-141. ISSN 0854-2910

[img]
Preview
Text
04_Memet-PTRKN_Kajian Termo-cd_new.pdf

Download (223kB) | Preview

Abstract

ABSTRAK KAJIAN TERMOHIDROLIKA TERAS PWR DAN BWR TERHADAP KEJADIAN SBO MENGACU PADA KECELAKAAN FUKUSHIMA. Kecelakaan Fukushima menginisiasi pembelajaran bagi jenis Pembangkit Listrik Tenaga Nuklir (PLTN) lainnya termasuk jenis Pressured Water Reactor (PWR). Penyebab utama kecelakaan ini adalah station blackout (SBO) sehingga sistem pendingin darurat pada teras, pemindah panas peluruhan, dan pengungkung bejana tidak dapat berfungsi. Kajian dilakukan adalah untuk menggali hasil kajian, analisis serta pengalaman operasi PLTN yang sudah dipublikasi jauh sebelum kecelakaan Fukushima terjadi. Kemudian kajian ini juga melakukan verifikasi dengan data kecelakaan Fukushima untuk memperoleh pengetahuan bagi pengembangan desain reaktor masa depan. Kajian menghasilkan kesamaan pola PWR dengan BWR, dan menyimpulkan sebuah rekomendasi kecelakaan rekomendasi untuk melakukan diversifikasi terhadap sistem pendingin darurat dan sistem generator diesel sehingga resiko kegagalan heatsink utama berakibat pelelehan teras bisa diperkecil. Kata kunci: SBO, pelelehan teras, kecelakaan Fukushima, PWR, BWR. ABSTRACT THERMALHYDRAULICS ASSESMENT OF PWR AND BWR CORES ON SBO EVENT REFERING FUKUSHIMA ACCIDENT. Fukushima accident initiated lesson learning for any other Nuclear Power Plant (NPP) types including Pressure Water Reactor (PWR) type. The main cause of the accident is station blackout (SBO) so that the system for core emergency cooling, decay heat removal, and vessel containment were fails to work. The assessment was done for exploring the published result of the assessments, analysis, and NPP operation experiences a long time before Fukushima accident happened. Furthermore, this assessment also carried out verification with Fukushima accident data to expertise the knowledge for future reactor design development. The assessment results accident pattern similarity of PWR with BWR’s one, summaries a recommendation to carry out diversification for emergency cooling system as well as diesel generator system so that the risk of ultimate heatsink failure effected to core melting, could be decreased. Keywords: SBO, core melting, Fukushima Accident, PWR, BWR

Item Type: Article
Subjects: Keselamatan dan Keamanan Nuklir
Divisions: Pusat Teknologi dan Keselamatan Reaktor Nuklir
Depositing User: USER PTKRN BATAN
Date Deposited: 12 Nov 2018 09:00
Last Modified: 12 Nov 2018 09:00
URI: http://repo-nkm.batan.go.id/id/eprint/4930

Actions (login required)

View Item View Item