e-Repository BATAN

Advanced Search

EVALUASI KINERJA SISTEM PRIMER REAKTOR PWR PADA KEJADIAN STATION BLACK OUT MENGGUNAKAN RELAP/SCDAP

Jupiter Sitorus Pane, JSP and Johhny Situmorang, JS (2013) EVALUASI KINERJA SISTEM PRIMER REAKTOR PWR PADA KEJADIAN STATION BLACK OUT MENGGUNAKAN RELAP/SCDAP. EVALUASI KINERJA SISTEM PRIMER REAKTOR PWR PADA KEJADIAN STATION BLACK OUT MENGGUNAKAN RELAP/SCDAP. pp. 77-87. ISSN 0854-2910

[img]
Preview
Text
89-99 Jupiter S Pane.pdf

Download (5MB) | Preview

Abstract

ABSTRAK EVALUASI KINERJA SISTEM PRIMER REAKTOR PWR PADA KEJADIAN STATION BLACK OUT MENGGUNAKAN RELAP/SCDAP. Kejadian station blackout (SBO) merupakan salah satu kondisi yang dapat memicu kecelakaan parah yaitu pelelehan teras reaktor. Oleh karena itu diperlukan suatu kemampuan analisis untuk menangani masalah-masalah kecelakaan parah dalam Laporan Analisis Kecelakaan. Untuk itu telah dilakukan analisis kecelakaan yang disebabkan oleh Station Blackout yang diikuti oleh gagal menutupnya katup power-operated relief valve di Pressurizer. Tujuan analisis ini adalah untuk mengevaluasi kinerja sistem primer reaktor pada kejadian SBO terjadi kegagalan menutup katup PORV pada Pressurizer dan kaitannya dengan manajemen kecelakaan. Evaluasi dilakukan dengan menggunakan perangkat lunak RELAP/SCDAPSIM yang mampu menganalisis secara termohidrolik kondisi sistem primer suatu reaktor daya. Hasil analisis menunjukkan bahwa setelah SBO kondisi temperatur, tekanan, tinggi air mengalami perubahan sehinga memicu kenaikan temperatur bahan bakar mencapai titik leleh dalam waktu 9,5 jam. Bila terjadi kegagalan menutup katup PORV di Presurizer maka turunnya tekanan primer sampai 4,24 MPa dapat memicu aktifnya Akumulator yang akan memasok air pendingin sehingga teras tidak mengalami pengosongan dan menunda tercapainya pelelehan bahan bakar. Penundaan ini memberi kesempatan kepada operator untuk melakukan manajemen kecelakaan. Kata kunci: Station black out, gagal, PORV, teras leleh. ABSTRACT AN EVALUATION OF PWR REACTOR PRIMARY SYSTEM DURING STATION BLACKOUT ACCIDENT USING RELAP/SCDAP. Station black out accident is one of condition that can initiate an accident that could lead to core melting. Therefore it is necessary to have a capability to analyze severe accident which is part of Safety Analysis Report. An accident analysis due to station blackout followed by failure of power operated relief valve in Pressurizer has been done. The purpose of the analysis is to evaluate cooling system performance due to the failure PORV of Pressurizer and its relation to accident management. The analysis was done using RELAP/SCDAP software which has a capability to evaluate thermal hydraulics performance of the power reactor. The result shows that after the station blackout the condition of temperature, pressure and coolant level will increase the fuel element temperature to reach melting point within 9,5 hours. When PORV failed, the pressure of primer system decreases and at 4,24 MPA can activate an accumulator to supply borated water to the core that avoid core uncovered and delayed core melting. The delay allows operator to manage the accident. Keywords: Station black out, failure, PORV, core melting.

Item Type: Article
Subjects: Keselamatan dan Keamanan Nuklir
Divisions: Pusat Teknologi dan Keselamatan Reaktor Nuklir
Depositing User: USER PTKRN BATAN
Date Deposited: 14 Nov 2018 08:03
Last Modified: 14 Nov 2018 08:03
URI: http://repo-nkm.batan.go.id/id/eprint/5271

Actions (login required)

View Item View Item