e-Repository BATAN

Advanced Search

EVALUASI PENUAAN PEMIPAAN SISTEM PENDINGIN PRIMER RSG-GAS

Hasibuan, Djaruddin (2006) EVALUASI PENUAAN PEMIPAAN SISTEM PENDINGIN PRIMER RSG-GAS. In: PROSIDING HASIL PENELITIAN PRSG.

[img]
Preview
Text
11hasibuan2, evaluasi penuaan.pdf

Download (166kB) | Preview

Abstract

EVALUASI PENUAAN PEMIPAAN SISTEM PENDINGIN PRIMER RSG-GAS. Untuk mengetahui kondisi terakhir pemipaan sistem pendingin primer reaktor RSG-GAS, telah dilakukan evaluasi pemipaan sistem pendingin primer tersebut di gedung Reaktor serba Guna–G.A.Siwabessy (RSG-GAS). Evaluasi yang dilakukan meliputi inspeksi visual dengan cara melakukan pengamatan langsung, inspeksi ketebalan dinding pipa dengan menggunakan “Ultrasonic Thickness Gauge”, pengujian kekerasan dengan menggunakan peralatan equotip. Dari hasil inspeksi visual yang telah dilakukan tidak ditemukan adanya indikasi kerusakan yang nyata, dan dari inspeksi ketebalan dan kekerasan dinding pemipaan diperoleh bahwa ketebalan rata-rata pipa tr = 6,2983 mm dan kekerasan H = 149,155 BHN. Setelah dilakukan evaluasi, diperoleh bahwa pemipaan system pendingin primer RSG-GAS masih dalam keadaan baik dan aman digunakan. Kata kunci: penuaan, inspeksi ABSTRACT AGEING EVALUATION OF THE RSG-GAS PRIMARY PIPING COOLING SISTEM. To know the last condition of the RSG-GAS primary piping cooling system, the evaluation of mentioned primary piping cooling system had been done in the building of RSG-GAS. The evaluation done involve the visual inspection by the direct inspection, thickness inspection by using ultrasonic thickness gauge, material hardness testing by using equotip and the result of evaluation base on the data collecting. From the visual inspection done, could not found any damage, and from thickness and hardness inspection of the wall pipe thickness had been found that the average thickness of the pipe tr = 6,2983 mm and the pipe hardness is H = 149,155 BHN. After the evaluation done, it was found that the piping of the RSG-GAS primary cooling system is in the well condition and safe for operation. Key words: ageing, inspection

Item Type: Conference or Workshop Item (Paper)
Subjects: Reaktor Nuklir > Teknologi Reaktor > Sistem Reaktor
Divisions: Pusat Reaktor Serba Guna
Depositing User: EDITOR PRSG BATAN
Date Deposited: 11 Feb 2019 04:43
Last Modified: 11 Feb 2019 04:43
URI: http://repo-nkm.batan.go.id/id/eprint/8616

Actions (login required)

View Item View Item